summaryrefslogtreecommitdiff
path: root/RelNotes
AgeCommit message (Collapse)AuthorFilesLines
2013-12-06Start 1.9 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2013-08-30Start the post-1.8.4 cycleLibravatar Junio C Hamano1-1/+1
It is tentatively called 1.8.5, but it should be an easy matter of renaming the release-notes file and RelNotes symlink to later call it 1.9 near the end of the cycle if we wanted to. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2013-05-29Start 1.8.4 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2013-03-18Start the post 1.8.2 cycleLibravatar Junio C Hamano1-1/+1
Again, tentatively let's call this cycle 1.8.3. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2013-01-02Start 1.8.2 cycleLibravatar Junio C Hamano1-1/+1
Various fixes that have been cooking in 'next' have been merged. All of them should go to 'maint' for 1.8.1.1 later. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2012-11-15Start 1.8.1 cycleLibravatar Junio C Hamano1-1/+1
Prepare the release notes for the upcoming release, and describe changes up to the 5th batch we just merged. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2012-08-22Kick off cycle towards 1.8.0Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2012-06-21The first batch for 1.7.12Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2012-04-11Kick off post 1.7.10 cycleLibravatar Junio C Hamano1-1/+1
I tentatively named the release notes "1.7.11" but this may have to be renamed to "1.8" or some other name later. Let's see how well we would do during this cycle. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2012-01-29Kick off the post 1.7.9 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2011-12-05Kick-off the 1.7.9 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2011-10-05Post 1.7.7 first waveLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2011-07-06Start 1.7.7 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2011-04-27Start 1.7.6 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2011-02-28Start preparing release notes to 1.7.5Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-09-29Start 1.7.4 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-09-29Git 1.7.3.1Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-09-06Documentation: move RelNotes into a directory of their ownLibravatar Nicolas Pitre1-1/+1
There are 108 of them already. That's a bit more than one third of all the files in the Documentation directory already, and still growing. Signed-off-by: Nicolas Pitre <nico@fluxnic.net> Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-09-01Prepare for 1.7.3Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-09-01Prepare for 1.7.2.3Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-08-19Git 1.7.2.2Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-07-27Git 1.7.2.1Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-05-08Start 1.7.2 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2010-02-13Start 1.7.1 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-12-26Kick off 1.7.0 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-10-17Start 1.6.6 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-07-29Start 1.6.5 cycleLibravatar Junio C Hamano1-1/+1
The next major release will be 1.6.5, hopefully with a shorter cycle than the 1.6.4 cycle. After that in 1.7.0 we can make potentially backward incompatible changes if necessary. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-05-08Start 1.6.4 developmentLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-05-08Start 1.6.3.1 maintenance series.Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2009-03-04Beginning of 1.6.3 development trackLibravatar Junio C Hamano1-1/+1
2009-03-04Beginning of 1.6.2 maintenance trackLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-12-27Start 1.6.2 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-08-17Start 1.6.1 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-08-17Start 1.6.0.X maintenance seriesLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-06-26Start draft release notes for 1.6.0Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-06-25GIT 1.5.6.1Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-04-20First batch of post 1.5.5 updatesLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-04-20GIT 1.5.5.1Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-02-17Sync with 1.5.4.2 and start 1.5.5 Release NotesLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2008-02-17GIT 1.5.4.2Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2007-09-03Start 1.5.4 cycleLibravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <gitster@pobox.com>
2007-09-03GIT 1.5.3.1: obsolete git-p4 in RPM spec file.Libravatar Junio C Hamano1-1/+1
HPA noticed that yum does not like the newer git RPM set; it turns out that we do not ship git-p4 anymore but existing installations do not realize the package is gone if we do not tell anything about it. David Kastrup suggests using Obsoletes in the spec file of the new RPM to replace the old package, so here is a try. Signed-off-by: Junio C Hamano <gitster@pobox.com>
2007-06-02Release Notes: start preparing for 1.5.3Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <junkio@cox.net>
2007-04-07Start 1.5.2 cycle by prepareing RelNotes for it.Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <junkio@cox.net>
2007-02-14Point top-level RelNotes link at 1.5.1 release notes being prepared.Libravatar Junio C Hamano1-1/+1
Signed-off-by: Junio C Hamano <junkio@cox.net>
2007-02-13Add release notes to the distribution.Libravatar Junio C Hamano1-0/+1
This also adds a hook in the Makefile I can use to automatically include pointers to documentation for older releases when updating the pages at http://kernel.org/pub/software/scm/git/docs/. Signed-off-by: Junio C Hamano <junkio@cox.net>