summaryrefslogtreecommitdiff
path: root/t/t0500-progress-display.sh
diff options
context:
space:
mode:
authorLibravatar SZEDER Gábor <szeder.dev@gmail.com>2019-09-16 22:54:12 +0200
committerLibravatar Junio C Hamano <gitster@pobox.com>2019-09-17 09:39:16 -0700
commit2bb74b53a49f92d433057f4d560b33f1fe2f770a (patch)
treeab34c2711e74477c231623b005a0b53e60ef0fe0 /t/t0500-progress-display.sh
parentRevert "progress: use term_clear_line()" (diff)
downloadtgif-2bb74b53a49f92d433057f4d560b33f1fe2f770a.tar.xz
Test the progress display
'progress.c' has seen a few fixes recently [1], and, unfortunately, some of those fixes required further fixes [2]. It seems it's time to have a few tests focusing on the subtleties of the progress display. Add the 'test-tool progress' subcommand to help testing the progress display, reading instructions from standard input and turning them into calls to the display_progress() and display_throughput() functions with the given parameters. The progress display is, however, critically dependent on timing, because it's only updated once every second or, if the toal is known in advance, every 1%, and there is the throughput rate as well. These make the progress display far too undeterministic for testing as-is. To address this, add a few testing-specific variables and functions to 'progress.c', allowing the the new test helper to: - Disable the triggered-every-second SIGALRM and set the 'progress_update' flag explicitly based in the input instructions. This way the progress line will be updated deterministically when the test wants it to be updated. - Specify the time elapsed since start_progress() to make the throughput rate calculations deterministic. Add the new test script 't0500-progress-display.sh' to check a few simple cases with and without throughput, and that a shorter progress line properly covers up the previously displayed line in different situations. [1] See commits 545dc345eb (progress: break too long progress bar lines, 2019-04-12) and 9f1fd84e15 (progress: clear previous progress update dynamically, 2019-04-12). [2] 1aed1a5f25 (progress: avoid empty line when breaking the progress line, 2019-05-19) Signed-off-by: SZEDER Gábor <szeder.dev@gmail.com> Signed-off-by: Junio C Hamano <gitster@pobox.com>
Diffstat (limited to 't/t0500-progress-display.sh')
-rwxr-xr-xt/t0500-progress-display.sh286
1 files changed, 286 insertions, 0 deletions
diff --git a/t/t0500-progress-display.sh b/t/t0500-progress-display.sh
new file mode 100755
index 0000000000..24ccbd8d3b
--- /dev/null
+++ b/t/t0500-progress-display.sh
@@ -0,0 +1,286 @@
+#!/bin/sh
+
+test_description='progress display'
+
+. ./test-lib.sh
+
+show_cr () {
+ tr '\015' Q | sed -e "s/Q/<CR>\\$LF/g"
+}
+
+test_expect_success 'simple progress display' '
+ cat >expect <<-\EOF &&
+ Working hard: 1<CR>
+ Working hard: 2<CR>
+ Working hard: 5<CR>
+ Working hard: 5, done.
+ EOF
+
+ cat >in <<-\EOF &&
+ update
+ progress 1
+ update
+ progress 2
+ progress 3
+ progress 4
+ update
+ progress 5
+ EOF
+ test-tool progress "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display with total' '
+ cat >expect <<-\EOF &&
+ Working hard: 33% (1/3)<CR>
+ Working hard: 66% (2/3)<CR>
+ Working hard: 100% (3/3)<CR>
+ Working hard: 100% (3/3), done.
+ EOF
+
+ cat >in <<-\EOF &&
+ progress 1
+ progress 2
+ progress 3
+ EOF
+ test-tool progress --total=3 "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display breaks long lines #1' '
+ sed -e "s/Z$//" >expect <<\EOF &&
+Working hard.......2.........3.........4.........5.........6: 0% (100/100000)<CR>
+Working hard.......2.........3.........4.........5.........6: 1% (1000/100000)<CR>
+Working hard.......2.........3.........4.........5.........6: Z
+ 10% (10000/100000)<CR>
+ 100% (100000/100000)<CR>
+ 100% (100000/100000), done.
+EOF
+
+ cat >in <<-\EOF &&
+ progress 100
+ progress 1000
+ progress 10000
+ progress 100000
+ EOF
+ test-tool progress --total=100000 \
+ "Working hard.......2.........3.........4.........5.........6" \
+ <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display breaks long lines #2' '
+ # Note: we dont need that many spaces after the title to cover up
+ # the last line before breaking the progress line.
+ sed -e "s/Z$//" >expect <<\EOF &&
+Working hard.......2.........3.........4.........5.........6: 0% (1/100000)<CR>
+Working hard.......2.........3.........4.........5.........6: 0% (2/100000)<CR>
+Working hard.......2.........3.........4.........5.........6: Z
+ 10% (10000/100000)<CR>
+ 100% (100000/100000)<CR>
+ 100% (100000/100000), done.
+EOF
+
+ cat >in <<-\EOF &&
+ update
+ progress 1
+ update
+ progress 2
+ progress 10000
+ progress 100000
+ EOF
+ test-tool progress --total=100000 \
+ "Working hard.......2.........3.........4.........5.........6" \
+ <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display breaks long lines #3 - even the first is too long' '
+ # Note: we dont actually need any spaces at the end of the title
+ # line, because there is no previous progress line to cover up.
+ sed -e "s/Z$//" >expect <<\EOF &&
+Working hard.......2.........3.........4.........5.........6: Z
+ 25% (25000/100000)<CR>
+ 50% (50000/100000)<CR>
+ 75% (75000/100000)<CR>
+ 100% (100000/100000)<CR>
+ 100% (100000/100000), done.
+EOF
+
+ cat >in <<-\EOF &&
+ progress 25000
+ progress 50000
+ progress 75000
+ progress 100000
+ EOF
+ test-tool progress --total=100000 \
+ "Working hard.......2.........3.........4.........5.........6" \
+ <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display breaks long lines #4 - title line matches terminal width' '
+ cat >expect <<\EOF &&
+Working hard.......2.........3.........4.........5.........6.........7.........:
+ 25% (25000/100000)<CR>
+ 50% (50000/100000)<CR>
+ 75% (75000/100000)<CR>
+ 100% (100000/100000)<CR>
+ 100% (100000/100000), done.
+EOF
+
+ cat >in <<-\EOF &&
+ progress 25000
+ progress 50000
+ progress 75000
+ progress 100000
+ EOF
+ test-tool progress --total=100000 \
+ "Working hard.......2.........3.........4.........5.........6.........7........." \
+ <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+# Progress counter goes backwards, this should not happen in practice.
+test_expect_success 'progress shortens - crazy caller' '
+ cat >expect <<-\EOF &&
+ Working hard: 10% (100/1000)<CR>
+ Working hard: 20% (200/1000)<CR>
+ Working hard: 0% (1/1000) <CR>
+ Working hard: 100% (1000/1000)<CR>
+ Working hard: 100% (1000/1000), done.
+ EOF
+
+ cat >in <<-\EOF &&
+ progress 100
+ progress 200
+ progress 1
+ progress 1000
+ EOF
+ test-tool progress --total=1000 "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display with throughput' '
+ cat >expect <<-\EOF &&
+ Working hard: 10<CR>
+ Working hard: 20, 200.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 30, 300.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 40, 400.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 40, 400.00 KiB | 100.00 KiB/s, done.
+ EOF
+
+ cat >in <<-\EOF &&
+ throughput 102400 1000
+ update
+ progress 10
+ throughput 204800 2000
+ update
+ progress 20
+ throughput 307200 3000
+ update
+ progress 30
+ throughput 409600 4000
+ update
+ progress 40
+ EOF
+ test-tool progress "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'progress display with throughput and total' '
+ cat >expect <<-\EOF &&
+ Working hard: 25% (10/40)<CR>
+ Working hard: 50% (20/40), 200.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 75% (30/40), 300.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 100% (40/40), 400.00 KiB | 100.00 KiB/s<CR>
+ Working hard: 100% (40/40), 400.00 KiB | 100.00 KiB/s, done.
+ EOF
+
+ cat >in <<-\EOF &&
+ throughput 102400 1000
+ progress 10
+ throughput 204800 2000
+ progress 20
+ throughput 307200 3000
+ progress 30
+ throughput 409600 4000
+ progress 40
+ EOF
+ test-tool progress --total=40 "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'cover up after throughput shortens' '
+ cat >expect <<-\EOF &&
+ Working hard: 1<CR>
+ Working hard: 2, 800.00 KiB | 400.00 KiB/s<CR>
+ Working hard: 3, 1.17 MiB | 400.00 KiB/s <CR>
+ Working hard: 4, 1.56 MiB | 400.00 KiB/s<CR>
+ Working hard: 4, 1.56 MiB | 400.00 KiB/s, done.
+ EOF
+
+ cat >in <<-\EOF &&
+ throughput 409600 1000
+ update
+ progress 1
+ throughput 819200 2000
+ update
+ progress 2
+ throughput 1228800 3000
+ update
+ progress 3
+ throughput 1638400 4000
+ update
+ progress 4
+ EOF
+ test-tool progress "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_expect_success 'cover up after throughput shortens a lot' '
+ cat >expect <<-\EOF &&
+ Working hard: 1<CR>
+ Working hard: 2, 1000.00 KiB | 1000.00 KiB/s<CR>
+ Working hard: 3, 3.00 MiB | 1.50 MiB/s <CR>
+ Working hard: 3, 3.00 MiB | 1024.00 KiB/s, done.
+ EOF
+
+ cat >in <<-\EOF &&
+ throughput 1 1000
+ update
+ progress 1
+ throughput 1024000 2000
+ update
+ progress 2
+ throughput 3145728 3000
+ update
+ progress 3
+ EOF
+ test-tool progress "Working hard" <in 2>stderr &&
+
+ show_cr <stderr >out &&
+ test_i18ncmp expect out
+'
+
+test_done